Government Projects
Internal Revenue Service
Concentric Security conducted a survey of the existing construction site to include a written report for GSA and IRS review. These reports assessed the condition/availability of power, control conduits, sump drains, and card access systems for inclusion in final drawings. Concentric furnished and installed 12 crash rated vehicle barriers, 13 ballistic guard booth, 15 stainless steel bollards, and card reader and Aiphone equipment. This project included the removal of existing hydraulic bollards at 5 locations.